Yankee Stadium
8 x SAF6000 in parallel for entire water supply of the complex, up to 2000 gpm, followed by hundreds of submicron cartridge filters in concessions and filtered water coolers downstream
Engineer: M-E Engineers Architect: Populous (formerly HOK Sport)
15 Central Park West, 201 apartments
3 x SAF6000 in parallel for domestic water up to 850 gpm;
1 x SAF6000 for cooling tower up to 300 gpm
Engineer: Flack + Kurtz Architect: Robert A.M. Stern
The Edge
Brooklyn, Building 1
3 x SAF6000 in parallel for domestic water up to 850 gpm
Engineer: Edwards & Zuck Architect: Steven B. Jacobs
The Edge
Brooklyn, Building 4
2 x SAF6000 in parallel for domestic water up to 600 gpm
Engineer: Edwards & Zuck Architect: Steven B. Jacobs